Charge standard

Moving price list

Serial number

Project name

Unit price (Yuan)

Work unit

Notes description

1

Base prices

180

Car

Initial price lift plus 20 Yuan flat

2

Building on the move

10

Floor/car

6 layer each layer 20

3

Under the floor moving

5

Floor/car

6 layer each layer 10

4

Flat slopes move

1

1 m

Loading point to the moving point within a distance of 20 metres with no charge

5

Truck distance

6

Here kilometres

Within 10 km with no charge

6

Single piece for the overweight

20

Floor

Over 80 kg or more billing

7

Bulky goods cannot enter the elevator

20

Floor

7 storeys each 30 yuan

8

Piano

300

Taiwan

Floor 20 Yuan on the next floor 10

9

Moving the piano mix

400

Car

Floor 20 Yuan on the next floor 10

10

-Packing

30

Car/Office

Each turn a place plus 40 (within 10 miles)

11

Unloading

3

Car/Office

Each turn a place plus 40 (within 10 miles)

12

Disassembly cupboard

80

Parts

At least 3 1 plus 20

13

Disassemble beds and iron beds

50

Parts

Wide and 1.5 meters above 80 per piece

14

Entry screen

30

People

Big screen plus 10 Yuan 1

15

Dismantle air conditioners

100

The Department of

2 160 3 240 5 350 Yuan

16

General Porter

40

Persons/hour

Starting price: 80 Yuan (within 3 hours)

17

Vehicles waiting to charge 1

60

Hour

6 in the morning to 18 o'clock

18

Vehicles waiting to charge 2

100

Hour

18 o'clock to 6 o'clock in the morning

19

Rental fares

100

2/hour

Large equipment interview

20

Installation fee

500

Ton

Costly big-ticket items interview

21

Lose loss

/

/

Pay-per-contract 50%